With an 18 week programme, Lynx Construction Group managed and built a 650m2, single floor Goods on Line extension which included an 80m2 walk-in chiller space and a 15m2 freezer section. The extension also included a meeting room, Click and Collect canopy with intercom and a ten bay, level GOL van loading bay. In addition, we also provided two fire proof lobbies.