Retail Section
Jagged Edge Barbers
Jagged Edge Barbers



Thumbnail 1
Thumbnail 2
Thumbnail 3



At Corey’s Mill, we installed a small Pod in Sainsbury’s existing car park. Electrics, drainage and water services were connected to the Pod which required trench works back to the main store. The programme was for 2 weeks. The Pod was pre-fabricated and installed onto a concrete pad foundation.